在线观看每日更新一区二区|成人国产爽爽爽爽爽爽|欧日韩一二三区综合视频|97在线精品国自产拍中文
SITEMAP| CONTACT| CHINESE| ENGLISH Welcome to Guangdong LongHong Electrical Equipment Co.,Ltd

Service Hotline:135-4996-2688

Guangdong LongHong Electrical Equipment Co.,Ltd

Contact us

Address:廣東省佛山市順德區(qū)陳村鎮(zhèn)白陳公路文海路段西側文海工業(yè)區(qū)9號之六

Sales Hotline:0757-23302558 400-617-3066?

Fax:0757-23305005

Mobile:13549962688

Email:wd@wdfdj.com?

After-Sale Service Hotline:400-669-1663

Home >NEWS>Group news

Diesel generator sets the pre - boot inspection requirements - Foshan generator

Date:2016-09-24 09:41:42

1, the construction site of the rated voltage of diesel generators must be consistent with the external power supply voltage level.

2, fixed diesel generator set should be installed in the room on the basis of the provisions, and should be higher than the indoor ground 0.25 ~ 0.30m. Mobile diesel generating units should be in a level state, placed firmly, the trailer should be reliable grounding, live. Outdoor use of diesel generating sets should be erected protective shed.

3, Diesel generator set and its control, distribution, repair room, etc. should be set to ensure electrical safety distance and meet the fire safety requirements; exhaust pipe should be out of the room, and is strictly prohibited in the indoor and smoke storage barrels near the pipeline.

4, the construction site of the diesel generator set installation environment should be chosen near the load center, easy access to the surrounding roads and to avoid the pollution source of the downstream side and easy to place water.

5, the generator power supply must be linked with the external power supply line, is strictly prohibited with the external lines running side by side; when 2 and 2 units above the parallel operation, the synchronization device must be installed and synchronized to the load after the unit power supply.


在线观看每日更新一区二区|成人国产爽爽爽爽爽爽|欧日韩一二三区综合视频|97在线精品国自产拍中文